A fast and precise methodology of creep master curve construction for geosynthetics based on stepped isothermal method (SIM)
Geotextiles and Geomembranes, ISSN: 0266-1144, Vol: 49, Issue: 4, Page: 952-962
2021
- 12Citations
- 15Captures
- 1Mentions
Metric Options: Counts1 Year3 YearSelecting the 1-year or 3-year option will change the metrics count to percentiles, illustrating how an article or review compares to other articles or reviews within the selected time period in the same journal. Selecting the 1-year option compares the metrics against other articles/reviews that were also published in the same calendar year. Selecting the 3-year option compares the metrics against other articles/reviews that were also published in the same calendar year plus the two years prior.
Example: if you select the 1-year option for an article published in 2019 and a metric category shows 90%, that means that the article or review is performing better than 90% of the other articles/reviews published in that journal in 2019. If you select the 3-year option for the same article published in 2019 and the metric category shows 90%, that means that the article or review is performing better than 90% of the other articles/reviews published in that journal in 2019, 2018 and 2017.
Citation Benchmarking is provided by Scopus and SciVal and is different from the metrics context provided by PlumX Metrics.
Example: if you select the 1-year option for an article published in 2019 and a metric category shows 90%, that means that the article or review is performing better than 90% of the other articles/reviews published in that journal in 2019. If you select the 3-year option for the same article published in 2019 and the metric category shows 90%, that means that the article or review is performing better than 90% of the other articles/reviews published in that journal in 2019, 2018 and 2017.
Citation Benchmarking is provided by Scopus and SciVal and is different from the metrics context provided by PlumX Metrics.
Most Recent News
武汉岩土所新型土工格室材料研发取得进展
土工格室是一种三维蜂窝立体结构状土工合成材料,自上世纪70年代研发以来,土工格室在加固路面基层、软基处理、加筋挡墙等工程中得到了广泛应用。目前商用土工格室原材料多为高密度聚乙烯...
Article Description
The variability of the virtual time of stepped isothermal method (SIM) was observed during the creep master curves construction of a new high-performance geosynthetics material, which led to the significant errors in predicting the long-term creep. After analyzing the process of construction, the difference in selecting the beginning and end segments is the reason causing the errors. Therefore, a set of computer-based routine was programmed to eliminate the errors. Based on the amount of data of SIM and conventional creep tests, the virtual time of each corresponding step, the curves of scaled creep data, and the comparison between these two creep data were obtained in the present study by the routine. They were used to study the influence of different beginning segments and end segments on the master creep curve. Overall, The 5% of elevated temperature step and 50% of the previous step is suggested to regard as the beginning segment and end segment respectively to obtain the more well-founded virtual time and more accurate creep curve. This study not only provides a reference for research focusing on accelerated creep tests but proposed a fast and accurate methodology to construct the creep master of SIM tests.
Bibliographic Details
http://www.sciencedirect.com/science/article/pii/S0266114421000145; http://dx.doi.org/10.1016/j.geotexmem.2021.01.005; http://www.scopus.com/inward/record.url?partnerID=HzOxMe3b&scp=85100608167&origin=inward; https://linkinghub.elsevier.com/retrieve/pii/S0266114421000145; https://dx.doi.org/10.1016/j.geotexmem.2021.01.005
Elsevier BV
Provide Feedback
Have ideas for a new metric? Would you like to see something else here?Let us know