Design/build for water/wastewater facilities: State of the industry survey and three case studies

Journal of Management in Engineering, ISSN: 0742-597X, Vol: 20, Issue: 1, Page: 16-24
2004
  • 35
    Citations
  • 0
    Usage
  • 56
    Captures
  • 0
    Mentions
  • 0
    Social Media
Metric Options:   Counts1 Year3 Year

Metrics Details

  • Citations
    35
    • Citation Indexes
      35
  • Captures
    56

Review Description

Documented successes of innovative delivery methods and recent changes in procurement laws are enabling water and wastewater utility owners to use alternative delivery methods for the construction of new facilities and the expansion of existing facilities. This shift toward alternative project delivery systems, such as design/build, has resulted in demand for additional guidance for owners and practitioners. This paper provides the results of an industrywide survey and three in-depth case studies. The survey results indicate large-scale growth in the use of design/build project delivery for water and wastewater facilities throughout the United States. The findings from the case studies indicate that common practices exist with regard to selecting a delivery system, contracting, allocating risk, evaluating proposals, determining the level of design in the request for proposals, using consultants, establishing trust, identifying key players, and permitting. These results serve as best practices for owners and practitioners using design/build delivery for the first time. © ASCE.

Provide Feedback

Have ideas for a new metric? Would you like to see something else here?Let us know