Development of the quality plan and standard operating procedure for tower retrofitting
2022
- 352Usage
Metric Options: CountsSelecting the 1-year or 3-year option will change the metrics count to percentiles, illustrating how an article or review compares to other articles or reviews within the selected time period in the same journal. Selecting the 1-year option compares the metrics against other articles/reviews that were also published in the same calendar year. Selecting the 3-year option compares the metrics against other articles/reviews that were also published in the same calendar year plus the two years prior.
Example: if you select the 1-year option for an article published in 2019 and a metric category shows 90%, that means that the article or review is performing better than 90% of the other articles/reviews published in that journal in 2019. If you select the 3-year option for the same article published in 2019 and the metric category shows 90%, that means that the article or review is performing better than 90% of the other articles/reviews published in that journal in 2019, 2018 and 2017.
Citation Benchmarking is provided by Scopus and SciVal and is different from the metrics context provided by PlumX Metrics.
Example: if you select the 1-year option for an article published in 2019 and a metric category shows 90%, that means that the article or review is performing better than 90% of the other articles/reviews published in that journal in 2019. If you select the 3-year option for the same article published in 2019 and the metric category shows 90%, that means that the article or review is performing better than 90% of the other articles/reviews published in that journal in 2019, 2018 and 2017.
Citation Benchmarking is provided by Scopus and SciVal and is different from the metrics context provided by PlumX Metrics.
Metrics Details
- Usage352
- Abstract Views315
- Downloads37
Artifact Description
This paper focuses on assessing and developing the Tower Retrofitting procedure of Ericsson Telecommunications, Philippines. It is one of the leading service providers of telecommunication infrastructure in Asia. The Intern was able to identify the common problems encountered during Tower Retrofitting implementation through the use of quality procedure techniques and checking points.As observed, these significant concerns were identified and analyzed in terms of their root cause. Control points were then established in the processes involved to minimize, if not eliminate, the recurrence of these conflicts. Upon the identification of the root cause of the problem, it was determined that there is no standard operating or quality procedure that would consistently ensure the quality and process of tower retrofitting. Thus, an efficient Tower Retrofitting flow and a detailed standard operating procedure applied to the current Tower Retrofitting system were developed. This approach involves an established flowchart for common reference and faster processing of documents aligned with the digitization of the current system due to the COVID-19 pandemic.The consistent implementation and follow-through of the proposed Tower Retrofitting Flow and Standard Operating procedures were constructed to improve the company's work quality and strengthen its clients' deliverables within the schedule and allotted budget.