Residential Bathroom and Tile Shower Addition During COVID-19 Quarantine
2021
- 135Usage
Metric Options: CountsSelecting the 1-year or 3-year option will change the metrics count to percentiles, illustrating how an article or review compares to other articles or reviews within the selected time period in the same journal. Selecting the 1-year option compares the metrics against other articles/reviews that were also published in the same calendar year. Selecting the 3-year option compares the metrics against other articles/reviews that were also published in the same calendar year plus the two years prior.
Example: if you select the 1-year option for an article published in 2019 and a metric category shows 90%, that means that the article or review is performing better than 90% of the other articles/reviews published in that journal in 2019. If you select the 3-year option for the same article published in 2019 and the metric category shows 90%, that means that the article or review is performing better than 90% of the other articles/reviews published in that journal in 2019, 2018 and 2017.
Citation Benchmarking is provided by Scopus and SciVal and is different from the metrics context provided by PlumX Metrics.
Example: if you select the 1-year option for an article published in 2019 and a metric category shows 90%, that means that the article or review is performing better than 90% of the other articles/reviews published in that journal in 2019. If you select the 3-year option for the same article published in 2019 and the metric category shows 90%, that means that the article or review is performing better than 90% of the other articles/reviews published in that journal in 2019, 2018 and 2017.
Citation Benchmarking is provided by Scopus and SciVal and is different from the metrics context provided by PlumX Metrics.
Metrics Details
- Usage135
- Abstract Views68
- Downloads67
Article Description
This paper outlines the design and construction of a new code compliant bathroom including: a low profile shower pan, ceramic-tile shower enclosure, and new plumbing piping and fixtures. One of the main objectives was to complete the new shower which would be easily accessible and maintenance free in order to support a local elderly couple. The selection of this project took place during the COVID-19 pandemic approximately nine months after California issued the first mandatory statewide Stay-at-Home Order. During the early design and development stages an opportunity to collaborate with a local trades-person was identified as well as the need for the selected project. The new bathroom is located on the lower level of a one-and-a-half story home. Some of the primary onsite work activities in the project are: replacing old cast iron plumbing with ABS Pipe, framing a new interior wall, installing interior cement backer board at the shower enclosure, and tile installation on the bathroom floor and the shower walls. The goal of the project was to construct a fully accessible bathroom for an elderly couple within their budget and schedule. This paper will detail the steps, key takeaways, and overall process in order to help future students and industry professionals.
Bibliographic Details
Provide Feedback
Have ideas for a new metric? Would you like to see something else here?Let us know