Proactive Recovery of Electric Power Assets for Resiliency Enhancement
2015
- 1Usage
Metric Options: CountsSelecting the 1-year or 3-year option will change the metrics count to percentiles, illustrating how an article or review compares to other articles or reviews within the selected time period in the same journal. Selecting the 1-year option compares the metrics against other articles/reviews that were also published in the same calendar year. Selecting the 3-year option compares the metrics against other articles/reviews that were also published in the same calendar year plus the two years prior.
Example: if you select the 1-year option for an article published in 2019 and a metric category shows 90%, that means that the article or review is performing better than 90% of the other articles/reviews published in that journal in 2019. If you select the 3-year option for the same article published in 2019 and the metric category shows 90%, that means that the article or review is performing better than 90% of the other articles/reviews published in that journal in 2019, 2018 and 2017.
Citation Benchmarking is provided by Scopus and SciVal and is different from the metrics context provided by PlumX Metrics.
Example: if you select the 1-year option for an article published in 2019 and a metric category shows 90%, that means that the article or review is performing better than 90% of the other articles/reviews published in that journal in 2019. If you select the 3-year option for the same article published in 2019 and the metric category shows 90%, that means that the article or review is performing better than 90% of the other articles/reviews published in that journal in 2019, 2018 and 2017.
Citation Benchmarking is provided by Scopus and SciVal and is different from the metrics context provided by PlumX Metrics.
Metrics Details
- Usage1
- Abstract Views1
Article Description
This paper presents a significant change in current electric power grid response and recovery schemes by developing a framework for proactive recovery of electric power assets with the primary objective of resiliency enhancement. Within the proposed framework, which can potentially present the next generation decision-making tool for proactive recovery, several coordinated models will be developed including: 1) the outage models to indicate the impact of hurricanes on power system components; 2) a stochastic pre-hurricane crew mobilization model for managing resources before the event; and 3) a deterministic post-hurricane recovery model for managing resources after the event. Proposed models will be extended to ensure applicability to a variety of electric power grids with different technologies and regulatory issues. The theoretical and practical implications of the developed models will push the research frontier of proactive response and recovery schemes in electric power grids, while its flexibility will support application to a variety of infrastructures, in response to a wide range of extreme weather events and natural disasters.
Bibliographic Details
Provide Feedback
Have ideas for a new metric? Would you like to see something else here?Let us know