NASA Launch Services Program Small Satellite Processing Capabilities at Kennedy Space Center and Vandenberg Air Force Base
2019
- 598Usage
Metric Options: CountsSelecting the 1-year or 3-year option will change the metrics count to percentiles, illustrating how an article or review compares to other articles or reviews within the selected time period in the same journal. Selecting the 1-year option compares the metrics against other articles/reviews that were also published in the same calendar year. Selecting the 3-year option compares the metrics against other articles/reviews that were also published in the same calendar year plus the two years prior.
Example: if you select the 1-year option for an article published in 2019 and a metric category shows 90%, that means that the article or review is performing better than 90% of the other articles/reviews published in that journal in 2019. If you select the 3-year option for the same article published in 2019 and the metric category shows 90%, that means that the article or review is performing better than 90% of the other articles/reviews published in that journal in 2019, 2018 and 2017.
Citation Benchmarking is provided by Scopus and SciVal and is different from the metrics context provided by PlumX Metrics.
Example: if you select the 1-year option for an article published in 2019 and a metric category shows 90%, that means that the article or review is performing better than 90% of the other articles/reviews published in that journal in 2019. If you select the 3-year option for the same article published in 2019 and the metric category shows 90%, that means that the article or review is performing better than 90% of the other articles/reviews published in that journal in 2019, 2018 and 2017.
Citation Benchmarking is provided by Scopus and SciVal and is different from the metrics context provided by PlumX Metrics.
Metrics Details
- Usage598
- Downloads426
- Abstract Views172
Artifact Description
The NASA Launch Services Program (LSP) Launch Site Integration Branch (LSIB) conducted a study to identify options for accommodating launch site support requirements for the next generation of NASA small satellites and secondary payloads launched from the Kennedy Space Center (KSC) and Vandenberg Air Force Base (VAFB). The anticipated needs range from cleanroom facilities, to long-term secure hardware storage, to propellant loading/unloading, to stacking and fairing encapsulation. Existing commercial and government payload processing facilities (PPF) are highly capable and commonly used to support satellite processing, while alternate options may be better tailored for the needs and budgets of small satellites. These include peripheral facilities such as PPF airlocks or partitioned spaces, existing facilities which can be refurbished or upgraded, and portable facilities such as cleanroom trailers. The LSP LSIB continues to evaluate its capability to meet the needs of small satellites and secondary payloads. The author requests input from the small satellite community, to help identify any emerging launch site requirements for future NASA small satellite and secondary payload missions.
Bibliographic Details
Provide Feedback
Have ideas for a new metric? Would you like to see something else here?Let us know