A DECISION SUPPORT SYSTEM FOR SUCCESS OF POST-HURRICANE RECONSTRUCTION OF TRANSPORTATION INFRASTRUCTURES
2020
- 19Usage
Metric Options: CountsSelecting the 1-year or 3-year option will change the metrics count to percentiles, illustrating how an article or review compares to other articles or reviews within the selected time period in the same journal. Selecting the 1-year option compares the metrics against other articles/reviews that were also published in the same calendar year. Selecting the 3-year option compares the metrics against other articles/reviews that were also published in the same calendar year plus the two years prior.
Example: if you select the 1-year option for an article published in 2019 and a metric category shows 90%, that means that the article or review is performing better than 90% of the other articles/reviews published in that journal in 2019. If you select the 3-year option for the same article published in 2019 and the metric category shows 90%, that means that the article or review is performing better than 90% of the other articles/reviews published in that journal in 2019, 2018 and 2017.
Citation Benchmarking is provided by Scopus and SciVal and is different from the metrics context provided by PlumX Metrics.
Example: if you select the 1-year option for an article published in 2019 and a metric category shows 90%, that means that the article or review is performing better than 90% of the other articles/reviews published in that journal in 2019. If you select the 3-year option for the same article published in 2019 and the metric category shows 90%, that means that the article or review is performing better than 90% of the other articles/reviews published in that journal in 2019, 2018 and 2017.
Citation Benchmarking is provided by Scopus and SciVal and is different from the metrics context provided by PlumX Metrics.
Metrics Details
- Usage19
- Downloads15
- Abstract Views4
Thesis / Dissertation Description
In the aftermath of hurricanes, when reliable transportation systems are vital, the chaotic and complex environment creates multiple uncertainties and risks in the reconstruction of transportation infrastructures. Damaged transport infrastructures decrease the timeliness of emergency responses and recovery procedures, and make it difficult for authorities, who are under excessive pressure and are struggling to find the financial resources to reconstruct them on time and within budget. The aim of this research was to develop a decision support system that would improve the cost and schedule performance, as well as reduce the number and extent of rework in post-hurricane reconstruction of transportation infrastructures. Significant factors that contribute to cost overruns, schedule delays, and the cost of reworks in post-hurricane reconstruction of transportation infrastructures (PRT) were statistically determined in this research. The results demonstrated that 26, 23, and 25 PRTs were statistically significant for cost overruns, schedule delays, and reworks of the mentioned projects, respectively. Three models were developed to predict the cost performance, schedule performance, and cost of reworks, and a stepwise multiple regression method was adopted. The results revealed that seven, nine, and ten PRTs were significant predictors of cost performance, schedule performance, and cost of reworks, respectively. The results demonstrated that frequency of on-site inspection, information management, and safety/environment issues were recorded as influential predictors in all three developed models to predict cost performance, schedule performance, and reworks in post-hurricane reconstruction of transport infrastructures. The extreme bounds analysis (EBA) method proposed by Leamer and Sala-i-Marin was adopted, and the criteria proposed by Sala-i-Martin was used. It was concluded from the results that four, six, and five significant predictors were robustly connected to cost performance, schedule performance, and the cost of reworks of the regression model, respectively. The results revealed that information management was a robust predictor shared between reconstruction cost performance and rework. Moreover, frequency of on-site inspection was the shared robust predictor between reconstruction cost and schedule performance in post-hurricane reconstruction of transportation infrastructures. It is believed that the findings of this research can provide a decision support system to stakeholders, decision makers, and project managers that will improve the success of post-hurricane reconstruction of transportation infrastructures. Additionally, this research provides accurate knowledge and information that will be helpful in effectively allocating limited resources after hurricanes and mitigating schedule delays, cost overruns, and reworks in reconstruction of transportation infrastructures.
Bibliographic Details
Provide Feedback
Have ideas for a new metric? Would you like to see something else here?Let us know