Identifying Issues Impacting Productivity Of Box Jacking Projects
2012
- 15Usage
Metric Options: CountsSelecting the 1-year or 3-year option will change the metrics count to percentiles, illustrating how an article or review compares to other articles or reviews within the selected time period in the same journal. Selecting the 1-year option compares the metrics against other articles/reviews that were also published in the same calendar year. Selecting the 3-year option compares the metrics against other articles/reviews that were also published in the same calendar year plus the two years prior.
Example: if you select the 1-year option for an article published in 2019 and a metric category shows 90%, that means that the article or review is performing better than 90% of the other articles/reviews published in that journal in 2019. If you select the 3-year option for the same article published in 2019 and the metric category shows 90%, that means that the article or review is performing better than 90% of the other articles/reviews published in that journal in 2019, 2018 and 2017.
Citation Benchmarking is provided by Scopus and SciVal and is different from the metrics context provided by PlumX Metrics.
Example: if you select the 1-year option for an article published in 2019 and a metric category shows 90%, that means that the article or review is performing better than 90% of the other articles/reviews published in that journal in 2019. If you select the 3-year option for the same article published in 2019 and the metric category shows 90%, that means that the article or review is performing better than 90% of the other articles/reviews published in that journal in 2019, 2018 and 2017.
Citation Benchmarking is provided by Scopus and SciVal and is different from the metrics context provided by PlumX Metrics.
Metrics Details
- Usage15
- Downloads12
- Abstract Views3
Thesis / Dissertation Description
Jacking is a trenchless construction technique used for installing underground pipeline system. Jacking method is more widely used for upgrading under capacity culverts and drainage structures under roads and railroad tracks. Also, this method is used for installing underground pipelines such as watermains, sewers etc.in populated and developed urban areas. In this method, culverts (segments) are installed through the ground from an entry shaft to an exit shaft. During the excavation and spoil removal processes, workers are required to be inside the pipe, this is essentially what separates pipe jacking trenchless construction method from microtunneling technology. The minimum recommended diameter for pipes installed by jacking is 42 in. as it may not be possible for a person to enter smaller diameter pipes.Pipe/box jacking projects often have to face schedule delays or loss of productivity due to inherent uncertainties in identifying unmarked under laid structures, type of soil and groundwater conditions. The contractor usually relies on the judgments, from experienced engineers and experts in forecasting productivity. This leads to development of imprecision cost estimates, and as a result, bidding price for box jacking projects is usually kept on a higher side. The main objective of this study is to identify and quantify productivity related issues in box jacking trenchless construction method based on case studies and the expert opinion of contactors, engineers and various Department of Transportation's (DOT'S) professionals involved in pipe/box jacking trenchless construction operations, using Analytic Hierarchy Process (AHP) method to rank the opinions. This study identifies six (traffic control, safety & security, availability of box storage & handling, type of spoil removal system, size of box & weight of box) factors and parameters that contractors and engineers can consider to avoid delays and improve jacking productivity. Ranking of these factors is expected to help in improving the productivity of the box jacking process by planning and executing in a more efficient manner. This research builds up the basics for modeling box jacking productivity operation during various conditions.
Bibliographic Details
Provide Feedback
Have ideas for a new metric? Would you like to see something else here?Let us know