Kinect Applications in Construction: From Tracking to Reconstruction
Industrial and Systems Engineering Research Conference (ISERC), Page: 259-267
2013
- 3Usage
Metric Options: CountsSelecting the 1-year or 3-year option will change the metrics count to percentiles, illustrating how an article or review compares to other articles or reviews within the selected time period in the same journal. Selecting the 1-year option compares the metrics against other articles/reviews that were also published in the same calendar year. Selecting the 3-year option compares the metrics against other articles/reviews that were also published in the same calendar year plus the two years prior.
Example: if you select the 1-year option for an article published in 2019 and a metric category shows 90%, that means that the article or review is performing better than 90% of the other articles/reviews published in that journal in 2019. If you select the 3-year option for the same article published in 2019 and the metric category shows 90%, that means that the article or review is performing better than 90% of the other articles/reviews published in that journal in 2019, 2018 and 2017.
Citation Benchmarking is provided by Scopus and SciVal and is different from the metrics context provided by PlumX Metrics.
Example: if you select the 1-year option for an article published in 2019 and a metric category shows 90%, that means that the article or review is performing better than 90% of the other articles/reviews published in that journal in 2019. If you select the 3-year option for the same article published in 2019 and the metric category shows 90%, that means that the article or review is performing better than 90% of the other articles/reviews published in that journal in 2019, 2018 and 2017.
Citation Benchmarking is provided by Scopus and SciVal and is different from the metrics context provided by PlumX Metrics.
Metrics Details
- Usage3
- Abstract Views3
Lecture / Presentation Description
Research on the use of imaging in construction and building information modeling (BIM) is still in its early stages. Imaging has been investigated in reconstructing building models, construction quality assurance and progress monitoring, and construction safety. In this paper, we survey the recent construction applications employing the low-cost Microsoft Kinect RGB-D sensors, as well as possible opportunities for applying Kinect in construction industry. Then we discuss a Kinect system under development for detecting objects in commercial buildings for use in reverse engineering of building information models. The invention of the low-cost Microsoft Kinect sensor has led to availability of inexpensive high-resolution depth and visual (RGB) sensing for a wide range of applications. The complementary nature of the depth and visual (RGB) information in the Kinect sensor opens up new opportunities to solve fundamental problems in construction imagining, including object and activity recognition, people tracking, 3D mapping and localization, etc.
Bibliographic Details
Provide Feedback
Have ideas for a new metric? Would you like to see something else here?Let us know