One Lincoln Street Arched Slurry Wall
2004
- 120Usage
Metric Options: CountsSelecting the 1-year or 3-year option will change the metrics count to percentiles, illustrating how an article or review compares to other articles or reviews within the selected time period in the same journal. Selecting the 1-year option compares the metrics against other articles/reviews that were also published in the same calendar year. Selecting the 3-year option compares the metrics against other articles/reviews that were also published in the same calendar year plus the two years prior.
Example: if you select the 1-year option for an article published in 2019 and a metric category shows 90%, that means that the article or review is performing better than 90% of the other articles/reviews published in that journal in 2019. If you select the 3-year option for the same article published in 2019 and the metric category shows 90%, that means that the article or review is performing better than 90% of the other articles/reviews published in that journal in 2019, 2018 and 2017.
Citation Benchmarking is provided by Scopus and SciVal and is different from the metrics context provided by PlumX Metrics.
Example: if you select the 1-year option for an article published in 2019 and a metric category shows 90%, that means that the article or review is performing better than 90% of the other articles/reviews published in that journal in 2019. If you select the 3-year option for the same article published in 2019 and the metric category shows 90%, that means that the article or review is performing better than 90% of the other articles/reviews published in that journal in 2019, 2018 and 2017.
Citation Benchmarking is provided by Scopus and SciVal and is different from the metrics context provided by PlumX Metrics.
Metrics Details
- Usage120
- Downloads110
- Abstract Views10
Conference Paper Description
One Lincoln Street is one of the most recent buildings constructed in downtown Boston. Its structure consists of a 36-story high-rise building directly connected to a 7-story low-rise building. Its substructure has five levels of underground parking garage to accommodate 900 cars in a city where prime real estate is becoming scarce. The excavation for the underground parking garage was supported by reinforced concrete slurry walls, which also serve as the substructure’s permanent walls. The stiffness of the slurry walls, together with the strut and tieback bracing system, minimized movement during excavation, which occurred in close proximity to existing buildings. Of particular interest is the northwest corner of the excavation, which was supported by an arched slurry wall, possessing a shape in plan of a quadrant of a circle with a radius of 50 feet. This paper presents key aspects of the analysis, design, construction and performance of the arched slurry wall. While the other slurry walls in the project were designed to support the 59 foot deep excavation with two levels of bracing, a remarkable feat by itself, the 3 foot thick arched slurry wall was analyzed, designed and constructed to support the excavation with no bracing. The analysis consisted of two-dimensional finite element models, modified to include the effects of three-dimensional arch action. Predicted lateral movement of the wall was minimal, having minor impact to adjacent structures, and measured inclinometer readings favorably support the predicted movements.
Bibliographic Details
Provide Feedback
Have ideas for a new metric? Would you like to see something else here?Let us know