Study on Seismic Retrofit Planning Method for Seweage Treatment Plants on the Basis of Seismic Risk Management
2001
- 66Usage
Metric Options: CountsSelecting the 1-year or 3-year option will change the metrics count to percentiles, illustrating how an article or review compares to other articles or reviews within the selected time period in the same journal. Selecting the 1-year option compares the metrics against other articles/reviews that were also published in the same calendar year. Selecting the 3-year option compares the metrics against other articles/reviews that were also published in the same calendar year plus the two years prior.
Example: if you select the 1-year option for an article published in 2019 and a metric category shows 90%, that means that the article or review is performing better than 90% of the other articles/reviews published in that journal in 2019. If you select the 3-year option for the same article published in 2019 and the metric category shows 90%, that means that the article or review is performing better than 90% of the other articles/reviews published in that journal in 2019, 2018 and 2017.
Citation Benchmarking is provided by Scopus and SciVal and is different from the metrics context provided by PlumX Metrics.
Example: if you select the 1-year option for an article published in 2019 and a metric category shows 90%, that means that the article or review is performing better than 90% of the other articles/reviews published in that journal in 2019. If you select the 3-year option for the same article published in 2019 and the metric category shows 90%, that means that the article or review is performing better than 90% of the other articles/reviews published in that journal in 2019, 2018 and 2017.
Citation Benchmarking is provided by Scopus and SciVal and is different from the metrics context provided by PlumX Metrics.
Metrics Details
- Usage66
- Downloads58
- Abstract Views8
Conference Paper Description
Japanese sewerage has more than 100 years of history, and many facilities have passed their durable years. For the sake of economy, life lengthening of the equipment and facilities is required. Rational life extension of the equipment and facilities calls for aseismic reinforcement of structures with damage risks considered. Based on this, the author et al. suggested a method that will help planning rational aseismic reinforcement for sewage treatment plants. This method quantitatively evaluates the relationship between the earthquake risk and aseismic reinforcement cost by introducing the concept of risk management. In this study, availability of this method also has been verified with exemplification.