Sunsense/Sunsmart Plus-UP Schools Program Final Inspection Report
2015
- 26Usage
Metric Options: CountsSelecting the 1-year or 3-year option will change the metrics count to percentiles, illustrating how an article or review compares to other articles or reviews within the selected time period in the same journal. Selecting the 1-year option compares the metrics against other articles/reviews that were also published in the same calendar year. Selecting the 3-year option compares the metrics against other articles/reviews that were also published in the same calendar year plus the two years prior.
Example: if you select the 1-year option for an article published in 2019 and a metric category shows 90%, that means that the article or review is performing better than 90% of the other articles/reviews published in that journal in 2019. If you select the 3-year option for the same article published in 2019 and the metric category shows 90%, that means that the article or review is performing better than 90% of the other articles/reviews published in that journal in 2019, 2018 and 2017.
Citation Benchmarking is provided by Scopus and SciVal and is different from the metrics context provided by PlumX Metrics.
Example: if you select the 1-year option for an article published in 2019 and a metric category shows 90%, that means that the article or review is performing better than 90% of the other articles/reviews published in that journal in 2019. If you select the 3-year option for the same article published in 2019 and the metric category shows 90%, that means that the article or review is performing better than 90% of the other articles/reviews published in that journal in 2019, 2018 and 2017.
Citation Benchmarking is provided by Scopus and SciVal and is different from the metrics context provided by PlumX Metrics.
Metrics Details
- Usage26
- Downloads19
- Abstract Views7
Report Description
This report provides information regarding the photovoltaic systems that are associated with the 2014 Sunsense/Sunsmart School Plus-UP program. Dave Click led the project as Principal Investigator and technical expert. Susan Schleith, participated as Co-Principal Investigator and education/school liaison. Four schools participated in the program. Each of the photovoltaic systems installed at the schools was inspected by the University of Central Florida's Florida Solar Energy Center (FSEC), as well as the local authority having jurisdiction (AHJ). This report details the results of the final inspections associated with National Electric Code (NEC) and performance testing as required by the Sunsense/Sunsmart Schools Plus-UP program for each school. All schools satisfactorily passed final inspection. All deliverables associated with the program have been met. Documentation relating to permits, SunEye Report, Operation Manual and photos are provided on a separate CD as part of this report.
Bibliographic Details
Provide Feedback
Have ideas for a new metric? Would you like to see something else here?Let us know