Trends in BIM Tools Adoption in Construction Project Implementation: A Case Study in Vietnam
Lecture Notes in Civil Engineering, ISSN: 2366-2565, Vol: 282, Page: 9-19
2023
- 1Citations
- 17Captures
Metric Options: CountsSelecting the 1-year or 3-year option will change the metrics count to percentiles, illustrating how an article or review compares to other articles or reviews within the selected time period in the same journal. Selecting the 1-year option compares the metrics against other articles/reviews that were also published in the same calendar year. Selecting the 3-year option compares the metrics against other articles/reviews that were also published in the same calendar year plus the two years prior.
Example: if you select the 1-year option for an article published in 2019 and a metric category shows 90%, that means that the article or review is performing better than 90% of the other articles/reviews published in that journal in 2019. If you select the 3-year option for the same article published in 2019 and the metric category shows 90%, that means that the article or review is performing better than 90% of the other articles/reviews published in that journal in 2019, 2018 and 2017.
Citation Benchmarking is provided by Scopus and SciVal and is different from the metrics context provided by PlumX Metrics.
Example: if you select the 1-year option for an article published in 2019 and a metric category shows 90%, that means that the article or review is performing better than 90% of the other articles/reviews published in that journal in 2019. If you select the 3-year option for the same article published in 2019 and the metric category shows 90%, that means that the article or review is performing better than 90% of the other articles/reviews published in that journal in 2019, 2018 and 2017.
Citation Benchmarking is provided by Scopus and SciVal and is different from the metrics context provided by PlumX Metrics.
Conference Paper Description
This study aims to investigate the emerging trends in the adoption of BIM tools in construction project implementation and the effectiveness of BIM implementation in the Vietnamese construction industry. A total of 159 valid samples were collected from the construction workforce based on their previous participation in or directly implementation construction projects adopting BIM tools. Data were calculated and assessed on the basis of their simple percentage and descriptive statistics (i.e., mean and standard deviation) approaches. The findings indicated that three BIM tools consist of Revit, Autodesk BIM 360, and Sketchup are the most frequently and commonly software in Vietnam construction project implementation. Also, adopting BIM tools can up to save 10% estimating cost suffice the value of the project and a savings of from 30 min up to 2 h in time using BIM tools per day from BIM users’ perspective. In addition, BIM tools have been most popularly adopted in three responsibilities including the design phase, quantity take-off, and project management in the implementation of construction projects in Vietnam.
Bibliographic Details
http://www.scopus.com/inward/record.url?partnerID=HzOxMe3b&scp=85138000915&origin=inward; http://dx.doi.org/10.1007/978-3-031-10853-2_2; https://link.springer.com/10.1007/978-3-031-10853-2_2; https://dx.doi.org/10.1007/978-3-031-10853-2_2; https://link.springer.com/chapter/10.1007/978-3-031-10853-2_2
Springer Science and Business Media LLC
Provide Feedback
Have ideas for a new metric? Would you like to see something else here?Let us know