Special Emergency Resources Preallocation Concerning Demand Time for Tunnel Collapse
International Journal of Disaster Risk Science, ISSN: 2192-6395, Vol: 14, Issue: 1, Page: 113-126
2023
- 1Citations
- 3Captures
Metric Options: CountsSelecting the 1-year or 3-year option will change the metrics count to percentiles, illustrating how an article or review compares to other articles or reviews within the selected time period in the same journal. Selecting the 1-year option compares the metrics against other articles/reviews that were also published in the same calendar year. Selecting the 3-year option compares the metrics against other articles/reviews that were also published in the same calendar year plus the two years prior.
Example: if you select the 1-year option for an article published in 2019 and a metric category shows 90%, that means that the article or review is performing better than 90% of the other articles/reviews published in that journal in 2019. If you select the 3-year option for the same article published in 2019 and the metric category shows 90%, that means that the article or review is performing better than 90% of the other articles/reviews published in that journal in 2019, 2018 and 2017.
Citation Benchmarking is provided by Scopus and SciVal and is different from the metrics context provided by PlumX Metrics.
Example: if you select the 1-year option for an article published in 2019 and a metric category shows 90%, that means that the article or review is performing better than 90% of the other articles/reviews published in that journal in 2019. If you select the 3-year option for the same article published in 2019 and the metric category shows 90%, that means that the article or review is performing better than 90% of the other articles/reviews published in that journal in 2019, 2018 and 2017.
Citation Benchmarking is provided by Scopus and SciVal and is different from the metrics context provided by PlumX Metrics.
Article Description
Lacking timely access to rescue resources is one of the main causes of casualties in tunnel collapse. To provide timely rescue, this study proposed a multi-objective preallocation model of special emergency resources for tunnel collapse based on demand time. Efficiency, multiple coverage, and cost-effectiveness are taken as the key objectives of the model; the demand time service range is used as a coverage decision factor considering the unique nature of tunnel collapse. The weight of potential disaster-affected points and other general factors are also considered in this model in order to thoroughly combine the distribution of disaster points and service areas. Further, we take 15 main tunnel projects under construction in China as an example. When the relative proximity to the ideal point of the selected optimal scheme ε is smaller than 0.5, we will adjust the weight of three objectives and reselect the optimal scheme until ε > 0.5. Compared with the not preallocated case, the number of rescue rigs needed is reduced by 8.3%, the number of covered potential disaster-affected points is increased by 36.36%, the weighted coverage times are increased from 0.853 to 1.383, and the weighted distance is significantly reduced by 99% when the rescue rigs are preallocated, verifying the feasibility and superiority of the proposed model.
Bibliographic Details
http://www.scopus.com/inward/record.url?partnerID=HzOxMe3b&scp=85148110595&origin=inward; http://dx.doi.org/10.1007/s13753-023-00470-5; https://link.springer.com/10.1007/s13753-023-00470-5; https://dx.doi.org/10.1007/s13753-023-00470-5; https://link.springer.com/article/10.1007/s13753-023-00470-5; http://sciencechina.cn/gw.jsp?action=cited_outline.jsp&type=1&id=7438021&internal_id=7438021&from=elsevier
Springer Science and Business Media LLC
Provide Feedback
Have ideas for a new metric? Would you like to see something else here?Let us know