Hierarchical multi-agent planning for flexible assembly of large-scale lunar facilities
Advanced Engineering Informatics, ISSN: 1474-0346, Vol: 55, Page: 101861
2023
- 11Citations
- 11Captures
Metric Options: CountsSelecting the 1-year or 3-year option will change the metrics count to percentiles, illustrating how an article or review compares to other articles or reviews within the selected time period in the same journal. Selecting the 1-year option compares the metrics against other articles/reviews that were also published in the same calendar year. Selecting the 3-year option compares the metrics against other articles/reviews that were also published in the same calendar year plus the two years prior.
Example: if you select the 1-year option for an article published in 2019 and a metric category shows 90%, that means that the article or review is performing better than 90% of the other articles/reviews published in that journal in 2019. If you select the 3-year option for the same article published in 2019 and the metric category shows 90%, that means that the article or review is performing better than 90% of the other articles/reviews published in that journal in 2019, 2018 and 2017.
Citation Benchmarking is provided by Scopus and SciVal and is different from the metrics context provided by PlumX Metrics.
Example: if you select the 1-year option for an article published in 2019 and a metric category shows 90%, that means that the article or review is performing better than 90% of the other articles/reviews published in that journal in 2019. If you select the 3-year option for the same article published in 2019 and the metric category shows 90%, that means that the article or review is performing better than 90% of the other articles/reviews published in that journal in 2019, 2018 and 2017.
Citation Benchmarking is provided by Scopus and SciVal and is different from the metrics context provided by PlumX Metrics.
Article Description
Several national space agencies and commercial aerospace companies plan to set up lunar bases with large-scale facilities that rely on multiple lunar robots’ assembly. Mission planning is necessary to achieve efficient multi-robot cooperation. This paper aims at autonomous multi-robot planning for the flexible assembly of the large-scale lunar facility, considering the harsh lunar environment, mission time optimization, and joint actions. The lunar robots and modules are scattered around the mission area without fixed assembly lines. Thus, the traditional assembly planning methods ignoring the optimal selection of modules are unable to handle this problem. We propose a hierarchical multi-agent planning method based on two-stage two-sided matching (HMAP-TTM) to solve this critical problem. First, the distributed planning framework with multi-replica public agents is introduced, ensuring robot plan knowledge consistency through public agents’ communication. Second, the hierarchical task graph (HTG) divides the mission into task layers based on task dependency knowledge. Third, we develop a novel two-stage two-sided matching algorithm. Time-optimal plans emerge from the matching games among public and private agents in each layer of HTG. Agents make decisions in the game based on action knowledge updated during planning. Finally, an assembly mission is presented to prove the method’s effectiveness. The simulation results show that the HMAP-TTM can generate plans with shorter mission time and require smaller communication costs than the baseline methods.
Bibliographic Details
http://www.sciencedirect.com/science/article/pii/S1474034622003196; http://dx.doi.org/10.1016/j.aei.2022.101861; http://www.scopus.com/inward/record.url?partnerID=HzOxMe3b&scp=85163173111&origin=inward; https://linkinghub.elsevier.com/retrieve/pii/S1474034622003196; https://dx.doi.org/10.1016/j.aei.2022.101861
Elsevier BV
Provide Feedback
Have ideas for a new metric? Would you like to see something else here?Let us know