Dependence of operational properties on reboiler duty in the removal of CO 2 from natural gas with aspen Hysys
Results in Engineering, ISSN: 2590-1230, Vol: 21, Page: 101755
2024
- 2Citations
- 11Captures
- 1Mentions
Metric Options: CountsSelecting the 1-year or 3-year option will change the metrics count to percentiles, illustrating how an article or review compares to other articles or reviews within the selected time period in the same journal. Selecting the 1-year option compares the metrics against other articles/reviews that were also published in the same calendar year. Selecting the 3-year option compares the metrics against other articles/reviews that were also published in the same calendar year plus the two years prior.
Example: if you select the 1-year option for an article published in 2019 and a metric category shows 90%, that means that the article or review is performing better than 90% of the other articles/reviews published in that journal in 2019. If you select the 3-year option for the same article published in 2019 and the metric category shows 90%, that means that the article or review is performing better than 90% of the other articles/reviews published in that journal in 2019, 2018 and 2017.
Citation Benchmarking is provided by Scopus and SciVal and is different from the metrics context provided by PlumX Metrics.
Example: if you select the 1-year option for an article published in 2019 and a metric category shows 90%, that means that the article or review is performing better than 90% of the other articles/reviews published in that journal in 2019. If you select the 3-year option for the same article published in 2019 and the metric category shows 90%, that means that the article or review is performing better than 90% of the other articles/reviews published in that journal in 2019, 2018 and 2017.
Citation Benchmarking is provided by Scopus and SciVal and is different from the metrics context provided by PlumX Metrics.
Most Recent News
Reports Summarize Engineering Study Results from University of Abuja (Dependence of operational properties on reboiler duty in the removal of CO2 from natural gas with aspen Hysys)
2024 MAR 13 (NewsRx) -- By a News Reporter-Staff News Editor at Energy Daily News -- Fresh data on engineering are presented in a new
Case Description
Obtaining CO 2 specification for cooking-gas requires an equilibrium stage in the absorption column of an existing plant. The column temperature influences the stage efficiency, 25 %, which must be kept constant for all stages to optimize the absorption temperatures. Additionally, the procedure employed the consistent daily plant data which were simulated directly. In this method the recycled 29 % monoethanol amine (MEA) start-up was imposed, so that 10 stages within 20–60 °C at 1.1 × 10 2 kPa were subjected to a circulation rates of 6000–16,000kg.mol/h. These parameter were used to evaluate the reboiler duty. The Kent−Eisenberg thermodynamic model renders circulation rate the most effective operational property. The reboiler duty at 1.19 × 10 9 W yielded 81.08 % grade of natural gas with negligible amount of CO 2 retained in the natural gas; which implies that a high stage efficiency was attained. Cleaner aqueous amine was obtained by raising the reboiler temperature to yield higher absorption efficiency, but the temperature was restricted to a maximum value of 120 °C due to amine degradation at higher temperatures. Thus, by adding the loss due to old circulation pump, the overall efficiency is significantly improved and the energy requirement is minimized.
Bibliographic Details
http://www.sciencedirect.com/science/article/pii/S2590123024000082; http://dx.doi.org/10.1016/j.rineng.2024.101755; http://www.scopus.com/inward/record.url?partnerID=HzOxMe3b&scp=85183469233&origin=inward; https://linkinghub.elsevier.com/retrieve/pii/S2590123024000082; https://dx.doi.org/10.1016/j.rineng.2024.101755
Elsevier BV
Provide Feedback
Have ideas for a new metric? Would you like to see something else here?Let us know