Load shedding as a result of failures at the political-technological interface
South African Journal of Science, ISSN: 1996-7489, Vol: 119, Issue: 9-10, Page: 1-5
2023
- 1Citations
- 13Captures
Metric Options: Counts1 Year3 YearSelecting the 1-year or 3-year option will change the metrics count to percentiles, illustrating how an article or review compares to other articles or reviews within the selected time period in the same journal. Selecting the 1-year option compares the metrics against other articles/reviews that were also published in the same calendar year. Selecting the 3-year option compares the metrics against other articles/reviews that were also published in the same calendar year plus the two years prior.
Example: if you select the 1-year option for an article published in 2019 and a metric category shows 90%, that means that the article or review is performing better than 90% of the other articles/reviews published in that journal in 2019. If you select the 3-year option for the same article published in 2019 and the metric category shows 90%, that means that the article or review is performing better than 90% of the other articles/reviews published in that journal in 2019, 2018 and 2017.
Citation Benchmarking is provided by Scopus and SciVal and is different from the metrics context provided by PlumX Metrics.
Example: if you select the 1-year option for an article published in 2019 and a metric category shows 90%, that means that the article or review is performing better than 90% of the other articles/reviews published in that journal in 2019. If you select the 3-year option for the same article published in 2019 and the metric category shows 90%, that means that the article or review is performing better than 90% of the other articles/reviews published in that journal in 2019, 2018 and 2017.
Citation Benchmarking is provided by Scopus and SciVal and is different from the metrics context provided by PlumX Metrics.
Article Description
Electricity ‘load shedding’ is not new to South Africa. When demand exceeds supply, distributors have little choice but to restrict use. Limited ability to meet the rapid growth in demand from the gold mining industry after World War II saw supplies rationed. Along with other users, the mining industry was again hit hard by rolling power cuts in early 2008. However, South Africa’s current inability to generate sufficient electricity to meet the needs of its people and economy can be attributed to a set of poor decisions (and, indecisions) dating from the 1994 political transition. This is not to say that the current load shedding is the consequence of the transition to non-racial democracy. The argument focuses rather on the nature of that transition. Specifically, it considers the relationship between an existing, inherently technological, public institution and the new political institutions which positioned themselves as the leaders of a developmental state. In particular, there was a failure to coordinate the parallel transitions of the country’s political institutions and of Eskom, its largest public enterprise. This experience also highlights future risks if a coherent national strategy for energy transition is not established.
Bibliographic Details
http://www.scopus.com/inward/record.url?partnerID=HzOxMe3b&scp=85171389940&origin=inward; http://dx.doi.org/10.17159/sajs.2023/16595; https://sajs.co.za/article/view/16595; http://www.scielo.org.za/scielo.php?script=sci_arttext&pid=S0038-23532023000500009&lng=en&tlng=en; http://www.scielo.org.za/scielo.php?script=sci_abstract&pid=S0038-23532023000500009&lng=en&tlng=en; http://www.scielo.org.za/scielo.php?script=sci_arttext&pid=S0038-23532023000500009; http://www.scielo.org.za/scielo.php?script=sci_abstract&pid=S0038-23532023000500009; https://dx.doi.org/10.17159/sajs.2023/16595
Academy of Science of South Africa
Provide Feedback
Have ideas for a new metric? Would you like to see something else here?Let us know