Flexible Networked Machine Integrated Scheduling Algorithm Based on the Dynamic Root Node Operation Set Considering Reverse Scheduling
Electronics (Switzerland), ISSN: 2079-9292, Vol: 12, Issue: 3
2023
- 2Citations
- 4Captures
- 1Mentions
Metric Options: CountsSelecting the 1-year or 3-year option will change the metrics count to percentiles, illustrating how an article or review compares to other articles or reviews within the selected time period in the same journal. Selecting the 1-year option compares the metrics against other articles/reviews that were also published in the same calendar year. Selecting the 3-year option compares the metrics against other articles/reviews that were also published in the same calendar year plus the two years prior.
Example: if you select the 1-year option for an article published in 2019 and a metric category shows 90%, that means that the article or review is performing better than 90% of the other articles/reviews published in that journal in 2019. If you select the 3-year option for the same article published in 2019 and the metric category shows 90%, that means that the article or review is performing better than 90% of the other articles/reviews published in that journal in 2019, 2018 and 2017.
Citation Benchmarking is provided by Scopus and SciVal and is different from the metrics context provided by PlumX Metrics.
Example: if you select the 1-year option for an article published in 2019 and a metric category shows 90%, that means that the article or review is performing better than 90% of the other articles/reviews published in that journal in 2019. If you select the 3-year option for the same article published in 2019 and the metric category shows 90%, that means that the article or review is performing better than 90% of the other articles/reviews published in that journal in 2019, 2018 and 2017.
Citation Benchmarking is provided by Scopus and SciVal and is different from the metrics context provided by PlumX Metrics.
Most Recent News
New Electronics Study Results Reported from Harbin University of Science and Technology (Flexible Networked Machine Integrated Scheduling Algorithm Based on the Dynamic Root Node Operation Set Considering Reverse Scheduling)
2023 FEB 28 (NewsRx) -- By a News Reporter-Staff News Editor at NewsRx Life Science Daily -- Investigators publish new report on electronics. According to
Article Description
Aiming at the problem that the previous flexible machine network integrated scheduling algorithm only considers positive sequence scheduling, which leads to the extension of product completion time, a reverse-order machine network integrated scheduling algorithm based on the dynamic root node operation set is proposed. In order to avoid the constraints of multi-predecessor operations in the process of forward-order scheduling, an encoding method based on dynamic root node operation set is proposed to ensure the validity of constraints among operations. The crossover methods based on crossover row vector and subtree are proposed to ensure the legitimacy of offspring individuals. The chaotic mutation method based on sibling operation and the random mutation method based on mutation row vector are proposed, respectively, to ensure the diversity of the population. A local search strategy based on the critical operation machine set is proposed, which enhances the search ability of the algorithm for optimal solutions. The comparative experimental results show that the proposed algorithm’s solving speed and solution quality outperform other comparison algorithms.
Bibliographic Details
Provide Feedback
Have ideas for a new metric? Would you like to see something else here?Let us know