A SYSTEMATIC APPROACH TO INVESTIGATE BIM IMPLEMENTATION IN TURKISH CONSTRUCTION INDUSTRY
Journal of Information Technology in Construction, ISSN: 1874-4753, Vol: 28, Page: 306-321
2023
- 2Citations
- 43Captures
Metric Options: CountsSelecting the 1-year or 3-year option will change the metrics count to percentiles, illustrating how an article or review compares to other articles or reviews within the selected time period in the same journal. Selecting the 1-year option compares the metrics against other articles/reviews that were also published in the same calendar year. Selecting the 3-year option compares the metrics against other articles/reviews that were also published in the same calendar year plus the two years prior.
Example: if you select the 1-year option for an article published in 2019 and a metric category shows 90%, that means that the article or review is performing better than 90% of the other articles/reviews published in that journal in 2019. If you select the 3-year option for the same article published in 2019 and the metric category shows 90%, that means that the article or review is performing better than 90% of the other articles/reviews published in that journal in 2019, 2018 and 2017.
Citation Benchmarking is provided by Scopus and SciVal and is different from the metrics context provided by PlumX Metrics.
Example: if you select the 1-year option for an article published in 2019 and a metric category shows 90%, that means that the article or review is performing better than 90% of the other articles/reviews published in that journal in 2019. If you select the 3-year option for the same article published in 2019 and the metric category shows 90%, that means that the article or review is performing better than 90% of the other articles/reviews published in that journal in 2019, 2018 and 2017.
Citation Benchmarking is provided by Scopus and SciVal and is different from the metrics context provided by PlumX Metrics.
Article Description
Architectural, engineering, and construction (AEC) industry is currently in a transition process that deeply affects the long-established way of collaboration and building information modelling (BIM) is at the centre of this transition. Achieving the smooth integration of BIM in construction projects requires companies to spend great effort and resources. In that sense, it is crucial to generate a comprehensive list of critical success factors (CSFs) of BIM adoption. This study aims to systematically identify the CSFs of BIM implementation in the construction phase and evaluate their effectiveness on real projects for Turkish construction industry. Within this context, an extensive literature review was conducted and CSFs were identified. The number of times each factor had been cited in the literature was recorded as the frequency. A comprehensive framework with 6 components was utilized including drivers, inputs, enablers, barriers, benefits and impacts. The identified CSFs were assigned to relevant components based on their contents. In an attempt to distinguish the responsibilities of the industry, firms, and project teams; each factor was categorized into three levels of influences (industry-, firm-, and project-level). A case study was employed to examine the effectiveness of each factor in practice through conducting interviews with the practitioners of 18 different construction projects. The interviewees were asked to specify the effectiveness of each factor in a 1-5 Likert Scale based on their experience in that particular project. This study is expected to promote BIM implementation in the construction industry and inform the industry professionals about the most significant factors to focus on. Further research may utilize the framework to conduct similar studies in different countries.
Bibliographic Details
International Council for Research and Innovation in Building and Construction
Provide Feedback
Have ideas for a new metric? Would you like to see something else here?Let us know